Coord, Production Planning - Edmonton
Posted 4 hours ago by Coca-Cola Europacific Partners
- Location:
- LONDON (109 miles)
- Job Type:
- Permanent
Edmonton Operations produce 50 million cases of drinks per year across their 7 manufacturing lines. The site can produce up to 142,000 litres of drink per hour consisting of both PET and Glass bottling. They are the only site in GB to produce our Oasis Drinks. There are over 200 people … more